How an Uğur Klima Vent project runs, from survey to signature

Method

From survey
to signature.

Five phases, one contractor carrying the responsibility through all of them.

  1. Survey & load calculation

    We walk the building, measure what is already there and calculate the real thermal and airflow load — not the figure the previous contractor assumed.

    • Site survey
    • Heat & airflow load
    • Budget envelope
  2. Design & documentation

    Duct routing, plant selection and single-line diagrams drawn against the architecture, with the fire and electrical scopes coordinated in the same model.

    • Layout drawings
    • Plant schedule
    • Coordination set
  3. Supply & procurement

    Equipment sourced against the schedule, delivered to programme, with sheet-metal and stainless fabrication produced in-house rather than subcontracted.

    • Equipment supply
    • Fabrication
    • Delivery programme
  4. Installation

    Our own crews install the ductwork, plant, pipework and wiring — one accountable team in the ceiling void instead of four trades negotiating for the same 300mm.

    • Ductwork & plant
    • Pipework
    • Power & controls
  5. Commissioning & handover

    Every system balanced to its design figures, tested, certified and handed over with the documentation an inspection will ask for.

    • Airflow balancing
    • Test certificates
    • O&M manual